Calendar

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Planning & Zoning Commission - Regular Session and Possible Work Study Session

 To watch the Planning Commission Meeting, go to the Watch Town Meetings page linked below and follow the prompts:

 

Consent Agenda:

  1. Consideration and possible approval of the October 11, 2023 Planning Commission meeting minutes and the November 8, 2023 Planning Commission Work Study Session meeting minutes.
  2. Discussion and Possible Action on P23-0120 Lennar at Madera Phase 3 Residential Design Review. Lennar is requesting approval of six (6) new standard plans three (3) elevations per plan to be constructed on 281 lots at the Madera subdivision, located south of Queen Creek Road and between Signal Butte and Meridian Road.
  3. Discussion and Possible Action on P23-0128 Rittenhouse Commons 2 Residential Design Review. Greg Davis, of iPlan Consulting, is requesting approval of three (3) new standard plans with two (2) elevations each to be constructed within 41 single-family attached buildings (amounting to a total of 166 townhome units) in the Rittenhouse Commons 2 subdivision, located at the northeast corner of Rittenhouse and Sossaman roads.

Public Hearing:

  1. Public Hearing and Possible Action on P23-0079, P23-0078, and P23-0080 Circle K at Ellsworth and Ocotillo Rezone, Conditional Use Permit and Site Plan, a request from Jodi Hammill (Land Development Consultants LLC) to rezone approximately 0.64 acres from R1-43 to C-2 and for Site Plan and Conditional Use Permit approval for the expansion and redevelopment of an existing fuel station and convenience store for a new 5,200 square foot convenience store and 3,264 square foot fuel station on a 1.21 acre site located at the northeast corner of Ellsworth and Ocotillo roads.
  2. Public hearing and possible action on Cases P23-0024 and P23-0028 AT&T Monopalm at U-haul Conditional Use Permit, and Site Plan, a request for Site Plan and Conditional Use Permit approval for the construction of a new 80-foot tall monopalm cell tower within a 1200sq.ft. walled equipment compound.

 Work Study Session:

  1. Buffer and Transition Manual Update
Return to full list >>